Whole-of-life clarity from every angle.
One platform, two wedges. Programme Intelligence gives each leader a role-specific view of the programme's own documents, in weeks. Lifecycle Governance runs one signed governance spine across thirty years of asset life, concept to post-closure. Auditable end to end, with humans in control, and deployable on sovereign Australian infrastructure.
The same platform, two stories: pick the one that fits.
Underneath, one platform: Fabric (Tailor's reasoning engine), governance recorded through the open PACT protocol, live Australian legislation from the PACT knowledge graph, Word-native collaboration, and connectors into the systems you already run. It can be deployed on sovereign Australian infrastructure. On top: two stories, two buyer shapes, two ways to start.
Programme Intelligence
Four role-based views of one shared programme record: CFO, risk lead, programme director, and board. Built for government, construction, infrastructure, and grant-funded mining. Light to set up, fast to pilot.
Lifecycle Governance
One continuous governance spine across the asset's whole life: acquisition, sustainment, retirement. Built for heavy industry running major capital programmes, typically co-delivered with a large consulting engagement partner.
Ingest. Analyze. Align. Programme clarity in weeks, not quarters.
Vantage isn't a dashboard bolted onto your existing PMO (programme management office). It replaces the grind: ingesting the artefacts, extracting the obligations, and driving consensus across the stakeholders.
Schedules, spreadsheets, contracts, legislation. One upload, structured automatically.
Programme teams hand over their artefacts as they are: P6 (Primavera) schedules, Excel trackers, Word reports, signed contracts, legislation PDFs. Vantage ingests them, extracts structure, builds the authority hierarchy, and maps document relationships. No manual tagging. No consultant data entry. Hundreds of documents become one structured programme.
Obligations, risks, decisions, dependencies. Extracted and classified.
AI extracts the obligations, risks, decisions, and dependencies buried across the programme's documents. Each item is classified against the regulatory instruments that apply: State Development Act, EPBC Act, Mining Act, grant conditions. Gap analysis runs across jurisdictions, building an obligations register in a fraction of the usual time.
Multi-stakeholder consensus. Parallel review, not serial email chains.
Programme boards, government reviewers, engineering leads, legal counsel: all reviewing simultaneously. Tracked changes, structured proposals, and approvals recorded through PACT, Tailor's open governance protocol. Every decision carries a government-grade audit trail, and pre-feasibility (PFS) sign-off runs in parallel instead of one inbox at a time.
See a capital programme get structured, end to end.
An interactive walkthrough of a worked example: multiple workstreams, several jurisdictions, hundreds of documents and obligations, from ingest to pre-feasibility sign-off. The PMO grind, automated.
Everything that slows capital delivery: gone.
- Manual status reports assembled by consultants
- Conflicting spreadsheets across teams
- Email-chain approvals that take weeks
- Consultant-assembled PowerPoint decks
- Version control chaos: "which version is current?"
- PMO spreadsheet graveyards
- Integrated programme dashboard: one shared record
- Automated compliance tracking across jurisdictions
- AI-drafted reports ready for the Minister
- Multi-stakeholder consensus, run in parallel
- Audit trail on every decision
- Obligations extracted, not manually assembled
Not a project tracker. A programme intelligence layer.
Vantage doesn't replace your P6 schedule. It reads it, extracts meaning, maps obligations, and drives consensus across the humans who need to sign off. The intelligence layer that sits above your existing tools.
Real-time workstream status, milestone tracking, risk heat maps. One view for the entire programme.
Multi-stakeholder parallel review through the open PACT protocol. Tracked changes, structured proposals, audit trail.
Automated mapping against grant conditions, KPIs, and milestones. Gap analysis before the board meeting.
What-if analysis on programme timelines, budget allocation, and risk cascades. Decision support, not gut feel.
AI-identified risks from programme artefacts. Probability, impact, and owner assigned. Continuously updated.
Pre-feasibility packages, compliance reports, ministerial briefings. Generated from the programme record, not copy-pasted.
One governance spine across thirty years of asset life.
Heavy industry runs a PMO designed for project delivery, and the spreadsheet starts on handover. Vantage Lifecycle closes the gap with one continuous 11-gate governance spine (concept, sustainment, retirement) on a single platform, typically co-delivered with a large consulting engagement partner.
Scoping → Handover
Sustaining Ops · Shutdowns · Mid-life
Decommissioning · Post-closure
Tracked changes, signing, and multi-party collaboration on the Word documents your teams already use, durable across decades.
Every gate, shutdown, and reinvestment runs on a visual workflow canvas drawn by Fabric, Tailor's reasoning engine.
Approvals and challenges are recorded through PACT, Tailor's open governance protocol, published for anyone to inspect. No lock-in: the protocol is public.
Australian legislation flows in from the PACT knowledge graph at pact.tailor.au, independent public infrastructure, so regulatory references stay current.
Every gate sign-off is checked against the customer's published Delegation of Authority, so the right person signs.
Connects to scheduling, maintenance, safety, and procurement systems (such as SAP, Primavera, and Maximo), scoped inside each engagement.
Nyrstar: Port Pirie and Hobart.
A 30-year lifecycle across two smelter sites, major capital works, multi-jurisdiction regulation. One signed governance spine from the final investment decision through shutdowns, mid-life reinvestment, decommissioning, and post-closure. The Tailor Lifecycle PMO Management Plan is the flagship deliverable, reproducible from a template for each new customer.
Built for programmes measured in billions.
Whole-of-life governance across two smelter sites, in first-customer delivery now
Obligations extracted from legal instruments across Queensland mining regulation
Built for government-grade audit, reporting, and multi-agency review
Proof-of-value engagements sized in weeks, not quarters
Your next programme. Your thirty-year asset. Our platform.
Two wedges, one platform story. Book 20 minutes and we'll run the demo that fits your shape, whether that's four role lenses on your current programme or an 11-gate lifecycle PMO spanning decades of asset custody.
Vantage is part of Tailor Intelligence, ambient intelligence for the industries that matter. Can be deployed on sovereign Australian infrastructure. We do not train on your data.